Skip links

PROJECTS

Umm Al Hayman

Umm Al Hayman Wastewater PPP Project procured by the State of Kuwait (MPW)

Main Contractor: WTE Wassertechnik GmbH
Location: Umm Al Hayman
Contract No: 2021-04-302/2021-04-303

Our scope of work included:
• Site survey, Design and Engineering.
• Procurement of all materials
• Fabrication and Welding.
• Installation of all Equipment
• Installation and Alignment of all Skid modules.
• Inspection and Testing
• Pre-commissioning and commissioning the system

SAC Chevron

SAC Fire Fighting System Modification

Main Contractor: Chevron/Al Mulla Engineering
Location: Al Zour
Contract No# SO #4410019859,4410020604

Innovative International Group successfully undertook the SAC Fire Fighting System Modification project, providing end-to-end services that ensured the seamless execution of all tasks.
Our scope of work included:
• Site survey, Design and submit the GA, Isometrics & As-Built drawings.
• Procurement of all materials.
• Concrete Foundation.
• Supply fabrication of stilling Tubes.
• Fabrication and welding of spools.
• Overhauling of engine with pump.
• Installation and alignment of both the pumps.
• Blasting and coating.
• Hydrotesting.
• Installation of shelters.
• Electrical and instrument control cables and fittings.
• Pre-commissioning and commissioning the system.

Each phase of the project was executed with precision, adhering to strict safety and quality standards, ensuring the successful modification of the fire fighting system to meet operational requirements.

SAC Wafra/MinaSoud 20"

Above Ground Onshore
Pipeline Repairwork

Main Contractor: Chevron/Al Mulla Engineering
Location: Al Zour
Contract No# SO #4410019360
Innovative International Group successfully executed the SAC Wafra / Mina Soud 20" Above Ground Onshore Pipeline Repair Work project, focusing on high-quality repair and maintenance of a critical pipeline.
The key activities undertaken during this project included:
• ROW preparation for 7km .
• Cold cutting of 20 Inch pipe line.
• Fabrication and welding of 20 inch line (12000 inch dia).
• Hydrotesting of 50 KM pipe line which includes water filling, pigging, swabbing and drying.
• Nitrogen purging & preservation of pipe length 50km.
• Blasting and coating of welded joints.
The project was executed with a focus on quality, safety, and timely completion, reinforcing our expertise in pipeline repair and maintenance for major infrastructure projects.

SPETCO

Jurassic Production Facilities
(West Ratqa) Phase 1 & 2

Main Contractor: SPETCO/ Al Yousifi Eng.
Location: KOC Abdali, North Kuwait
Contract No: AYEC/JPF/SCA/AGP/06/33 & AYEC/JPF/SCA/AGP/09/95

Activities:
• Shop fabrication welding of carbon steel and stainless steel spools as per approved drawings, (44000 inch dia). .
• Site fabrication and Erection of Carbon Steel and Stainless-Steel Pipes (11000 Inch dia).
• Blasting & Coating Services (22000 square meters) .
• Erection of Skids (1687 Tons) .
• Erection of structure and pipe racks (200 Tons) .
• Erection of shelters .
• Hydro testing and pre-commissioning activities.

This project reflects our commitment to delivering high-quality services in the Oil & Gas sector, with stringent safety standards, advanced techniques, and a focus on timely execution.

Schlumberger

Jurassic Production Facilities

Main Contractor: Schlumberger.
Location: KOC Abdali, North Kuwait.
Contract #TKW303954A

Activities:
• Site fabrication & Erection of Carbon Steel & Stainless-Steel Pipe Spools (7000 Inch dia) .
• Valves Erection

This project showcases our expertise in handling complex infrastructure and mechanical tasks within the oil and gas sector, with a focus on delivering high-quality results on time.

Al Khorayef

Al Khorayef Group Company

Main Contractor: Al Khorayef Group Company.
Location: KOC, West Kuwait
Contract No: AYEC/JPF/SCA/AGP/06/33 & AYEC/JPF/SCA/AGP/09/95

Activities: Piping Works.
• Field Fabrication, Welding .
• NDT
• Erection including installation of valves and inline
• Instruments .
• Hydrotest-including supply and disposal of water .
• Reinstatement .
• As built Documentation.

Al Khorayef

Large Scale Thermal
Pilot Plant - South Ratqa

Main Contractor: Al Khorayef Company
Location: KOC, West Kuwait
Contract No: # SC(L)LSTP/003

Project Overview
The Large Scale Thermal Pilot Plant at South Ratqa, located in West Kuwait under the Kuwait Oil Company (KOC), is a significant engineering project carried out by Al Khorayef Company. This project involves a wide range of activities designed to meet the highest standards of safety, quality, and efficiency in plant construction and operation.

Activities: Piping Works.
• Field Fabrication, Welding .
• NDT
• Erection including installation of valves and inline
• Instruments .
• Hydrotest-including supply and disposal of water .
• Reinstatement .
• As built Documentation.

Al Khorayef

Crude Processing & Production Facility GC 16 West Kuwait

Main Contractor: Al Khorayef Group Company.
Location: KOC, West Kuwait .
Contract No: # SC(L)/GC16/009 & SC(L) GC 16/004

Project Overview
The Crude Processing & Production Facility at GC 16 in West Kuwait is a major project executed by Al Khorayef Group Company. Located within the Kuwait Oil Company (KOC) premises, this project involves key activities that contribute to the overall production and processing of crude oil, ensuring efficiency and safety in operations.

Activities:
• Small Bore Piping Works: Site survey as per P &ID, Preparation of Isometric / Weld mapping Drawing, Fabrication, Welding, Testing, NDT, Erection including valve below 2 Inch, Hydrotesting etc .
• Undergrounding Pipe Wrapping Works: Surface prepara tion, coating and warping of underground pipes

Mushrif Trading and Contracting Co

MPW-Study, Design & contruction, Operation & Maintenance of Pumping Station, Waste Water treatment Plant & Pressure Mains

Main Contractor: Mushrif Trading and Contracting Co.
Location: Amghara & New Jahra, Kuwait
Contract No: # SC/SE100/2009/0066
Project Overview
The project involves the study, design, construction, operation, and maintenance of a pumping station, wastewater treatment plant, and pressure mains in the South of Amghara and South of New Jahra Scrap Area in Kuwait. Executed by Mushrif Trading and Contracting Co., this project focuses on ensuring efficient waste management and water treatment systems to support the region's infrastructure.
Activities:
• Fabrication of stainless-steel piping from 2inch to 40 inch including erection works.
• Erection of all valves and flow meters
• Radiography test
• Fixing of pipe supports & brackets
• Fabrication of pipe spools
• Fabrication and Installation of Stainless steel Structures, Modification of S S Sections.
• Erection of skip hoists.
• Modification of discharge piping and bucket.
• Scaffolding works
• Dismantling of two header DI lines.
• Fabrication and Erection of new carbons steel lines including welding of spools & radiography test.
• Intemal Lining works and extemal lining works for Caron Steel Pipe spools.
• Installation of pipe supports
• Hydrotesting of spools before installation and leak test for the whole line as per standards .
• Providing commissioning assistance.

Mushrif Trading and Contracting Co

MPW-Construction, Operation and maintenance of TSE network and reservoirs

Main Contractor: Mushrif Trading and Contracting Co
Location: Kabd, Kuwait
Contract No# SC/SEB0/2013/014

Project Overview
The MPW project in Kabd, Kuwait, involves the construction, operation, and maintenance of the TSE (Treated Sewage Effluent) network and reservoirs for Project Area C. Executed by Mushrif Trading and Contracting Co., this project plays a vital role in the sustainable management of wastewater for reuse in the region.

Activities:
• Metal works in SE80 project .
• Supply fabrication of stainless-steel ladders cages,
• Supply fabrication of stainless-steel air vent pipes.
• Supply fabrication of stainless-steel handrail .
• Supply fabrication of stainless-steel grating trench cover